Skip to content
Instrument Ledger
Directory

Futures Tick Value Delivery Settlement

CME Euro FX (6E) and Japanese Yen (6J) Half-Pip Ticks and CLS Physical Delivery

CME G10 currency futures quote in American terms (USD per foreign unit)—inverting USD/JPY into JPY/USD on 6J—and settle via physical Payment-versus-Payment (PvP) wire transfers through CLS Bank on the third Wednesday of IMM months.

By Grant Holloway, FRM, ERPReview not recorded
CME Euro FX (6E) and Japanese Yen (6J) Half-Pip Ticks and CLS Physical Delivery — Instrument Ledger 2026 quantitative & supervisory data card
Instrument Ledger (CME, ICE & Eurex Contract Multipliers, Tick Values & Delivery Mechanics): Half-pip $6.25 ticks, inverted 1/USDJPY 6J convexity, FX Link 0.1-pip rolls, and 6C T+1 expiry.Source: Instrument Ledger Institutional Research DeskLicense: CC-BY-4.0

Under CME G10 Currency Futures Contract Specifications (CME Rulebook Chapters 250–261), flagship Euro FX (6E, €125,000) and Japanese Yen (6J, ¥12,500,000) futures standardize central clearing, anonymous L2 depth, and half-pip ($6.25) minimum outright tick increments. Yet two specification pitfalls catch OTC interbank FX traders off guard when routing to CME Globex: first, CME quotes G10 FX futures in "American terms" (US dollars per unit of foreign currency)—meaning 6J is the reciprocal (1 / USDJPY) of OTC spot USD/JPY, flipping long/short directional signs and introducing convexity! Second, unlike cash-settled emerging-market NDF futures (6L BRL, SIR INR), all CME G10 FX futures (6E, 6J, 6B, 6A, 6C, 6S) are physically delivered via CLS Bank Payment-versus-Payment (PvP) gross wire exchange on the third Wednesday of March, June, September, and December!

Within our CME, ICE and Eurex Futures Multipliers and Delivery Guide under the CME, ICE & Eurex Contract Multipliers, Tick Values & Delivery Mechanics hub, this FX specification guide links directly with covered interest parity math in our Listed Contract Basis and Implied Repo Calculator.

Half-Pip Outright Ticks ($6.25) vs Tenth-Pip Spreads & Inverted 6J Math#

To compete directly with ECN spot platforms (EBS, Reuters Matching, Currenex), CME slashed outright minimum ticks on 6E and 6J to half a pip:

  • Euro FX (6E): Contract size = €125,000; Outright tick = $0.00005 per EUR (0.5 pip) = $6.25 ($12.50 per full pip); Calendar spread (ICS) and CME FX Link basis tick = $0.00001 per EUR (0.1 pip = $1.25); Micro M6E (€12,500) = $1.25 per full-pip ($0.0001) tick.
  • Japanese Yen (6J): Contract size = ¥12,500,000; Quoted in USD per 1 JPY (typically scaled by 10^7 or 0.0065800 USD/JPY); Outright tick = $0.0000005 per JPY = $6.25; Calendar spread tick = $0.0000001 per JPY = $1.25!

Watch what happens when OTC USD/JPY rallies from 150.00 to 155.00 (Yen weakens): OTC USD/JPY goes UP, whereas CME 6J goes DOWN from 0.0066665 to 0.0064515! To go long USD/JPY (bullish Dollar, bearish Yen), you must SHORT 6J!

CME G10 FX futures T-2 Monday 09:16 CT termination to third-Wednesday CLS Bank PvP physical wire delivery
CME G10 FX futures T-2 Monday 09:16 CT termination to third-Wednesday CLS Bank PvP physical wire deliveryVerified Exhibit

Covered Interest Parity Forward Points and 6J Reciprocal Convexity#

Because 6E is a cleared fixed-date forward contract settling on IMM Wednesday, its basis over OTC Spot EUR/USD reflects Covered Interest Rate Parity (CIP): Forward - Spot = Spot × (r_USD - r_EUR + xccy_basis) × (T / 360). Meanwhile, when converting OTC USD/JPY volatility or pip risk onto 6J, the reciprocal transformation P_6J = 1 / S_USDJPY alters exact pip sensitivity as USD/JPY moves from 110 to 155:

Reciprocal JPY/USD Pip Sensitivity and 6J Lot Sizing#

Formula or model from the articleNot independently verified
CME_6J_Price = ( 1 / Spot_USDJPY ) + IMM_Forward_Points_JPYUSD
  • OneOTCPipin6J_USD = 12,500,000 * [ (1 / S) - (1 / (S + 0.01)) ] ~= $12,500,000 * 0.01 / S^2
  • Worked 6J Hedge Sizing & Pip Sensitivity Audit at Spot USD/JPY = 152.00:
  • Notional USD Size of 1 CME 6J Contract = ¥12,500,000 / 152.00 = $82,236.84 USD (NOT $125,000!)
  • Hedging $10,000,000 OTC Long USD/JPY requires SHORTING: $10,000,000 / $82,236.84 = 121.6 -> 122 contracts of 6J!
  • Dollar Value of 1 OTC USD/JPY Pip (152.00 -> 152.01) on 1 6J lot = 125,000 / (152.00)^2 = $5.41 per OTC pip
  • (Whereas 1 minimum 6J futures tick of 0.0000005 equals $6.25, or ~1.155 OTC USD/JPY pips at 152.00!)

Major CME G10 & EM Currency Futures Specification Matrix#

Cross-reference CLS PvP settlement risk standards under CPMI-IOSCO Principles for Financial Market Infrastructures (PFMI) and CFTC clearing rules.

Quantitative Distribution · Currency Pair Equivalent
Currency Pair EquivalentForeign Lot Size
01Japanese Yen (6J)Inverted 1 / US…02Canadian Dollar (6C)Inverted 1 / US…03Brazilian Real (6L)Inverted 1 / US…
CME FX TickerCurrency Pair EquivalentForeign Lot SizeOutright Tick & USDMicro Ticker (1/10th)Terminal Settlement
Euro FX (6E)Direct EUR/USD€125,000$0.00005 = $6.25M6E (€12.5k, $1.25/pip)Physical CLS (3rd Wed)
Japanese Yen (6J)Inverted 1 / USDJPY¥12,500,000$0.0000005 = $6.25MJY (¥1.25M, $1.25)Physical CLS (3rd Wed)
British Pound (6B)Direct GBP/USD£62,500$0.0001 = $6.25M6B (£6,250, $0.625)Physical CLS (3rd Wed)
Australian Dollar (6A)Direct AUD/USDA$100,000$0.00005 = $5.00M6A (A$10k, $1.00)Physical CLS (3rd Wed)
Canadian Dollar (6C)Inverted 1 / USDCADC$100,000$0.00005 = $5.00MCD (C$10k, $1.00)Physical CLS (Tue pre-3rd Wed)
Brazilian Real (6L)Inverted 1 / USDBRLR$100,000$0.00005 = $5.00—Cash (Central Bank PTAX)
USD notional value per standard CME G10 FX contract across 6E, 6A, 6J, 6B, and 6C
USD notional value per standard CME G10 FX contract across 6E, 6A, 6J, 6B, and 6CVerified Exhibit

The Canadian Dollar (6C) T+1 Expiration Exception!#

Every FX desk building automated IMM roll calendars must hard-code one vital North American exception: because OTC spot EUR/USD, USD/JPY, GBP/USD, and AUD/USD settle T+2, 6E, 6J, 6B, and 6A cease trading at 09:16:00 CT on the Monday two business days before the third Wednesday. However, OTC spot USD/CAD settles T+1! Therefore, CME Canadian Dollar (6C) continues trading for an extra 24 hours, expiring at 09:16:00 CT on the TUESDAY immediately preceding the third Wednesday so its final settlement aligns seamlessly with T+1 OTC spot USD/CAD for Wednesday CLS delivery—Synchronizing quarterly IMM currency rolls directly alongside Three-Month SOFR (SR3) IMM rate fixings and ICE Three-Month SONIA IMM accrual windows!

Frequently asked questions

Why did my CME Japanese Yen (6J) position lose money when USD/JPY went up?

OTC spot USD/JPY quotes Yen per 1 US dollar, whereas CME 6J quotes US dollars per 1 Japanese Yen (1 / USDJPY). When USD/JPY rises from 150 to 153, the Yen weakens and 6J falls—so going long USD/JPY requires shorting 6J.

What happens if a retail or non-CLS hedge fund holds CME 6E or 6J past 09:16 CT on Expiration Monday?

Because CME G10 FX futures physically exchange EUR or JPY for USD via CLS Bank / agent banks on the third Wednesday, non-deliverable brokerage accounts force-liquidate open positions prior to Monday 09:16 CT (or Tuesday for 6C).

Why does CME Canadian Dollar (6C) expire on Tuesday morning while Euro FX (6E) expires on Monday morning?

Both contracts physically deliver on the third Wednesday. Because interbank spot EUR/USD settles T+2, Monday is two business days prior to Wednesday; because North American spot USD/CAD settles T+1, Tuesday is one business day prior.

What is CME FX Link and why does it quote in $1.25 (0.1-pip) increments?

CME FX Link is a central limit order book trading the basis spread between OTC Spot FX and CME FX Futures. Quoting in 0.1-pip ($1.25) ticks lets banks convert cleared futures directly into OTC spot liquidity or roll IMM maturities tightly.

Publication record

Published
November 14, 2026
Updated
November 14, 2026
Author
Grant Holloway, FRM, ERP
Review
Review not recorded
Automated fact check
Passed in the stored pipeline record
Source URLs
3 recorded

AI assistance recorded: anthropic/claude-opus-4.6. This field does not establish human review or source verification.

Academic & Institutional Attribution

Cite This Research & Embed Live Data Card

Open Attribution License (CC BY 4.0)

Standard academic & institutional research paper citation format.

Grant Holloway, FRM, ERP. (2026, November 14). CME Euro FX (6E) and Japanese Yen (6J) Half-Pip Ticks and CLS Physical Delivery. Instrument Ledger. https://instrumentledger.com/specs/cme-g10-fx-6e-6j-imm-physical-cls-currency-settlement-mechanics

Regulatory Directory Cross-Reference

Referenced Institutions & Regulatory Registries

Referenced Supervisory Authorities

Explore Futures Tick Value Delivery Settlement Hub (20) →

Instrument Ledger Data, Benchmarks & Contributor Records

CME Euro FX (6E) & Yen (6J) Tick Value & CLS Delivery Specs | Instrument Ledger